Catalog: Radian Communication Services
Company/Brand: Radian Corporation
|
| | 65G 65G-1 70 December 1, 1996 Sheet D-2877 (Replaces D-2787) If ANCO nuts are required, add AN to part number. * Final digit(s) in part number determined by distance in feet from base to lug. See appropriate engineering drawing for elevations. D Available by special order only. H Towers mounted on this base must be guyed at all times. F This item is not to be used without proper design consideration. Do not install towers and masts near power lines. All towers or masts should be installed twice the height of installation away from power lines since every electrical wire must be considered dangerous. ...
|
| | G Series Bracketed Towers GBRK-1 106 March 1, 1989 Sheet D-2530 (Replaces D-2445) REFERENCE SHEET AND ASSEMBLY INFORMATION BRACKETOWERS, NON-GUYED INSTALLATION: Select a tower location sufficiently clear and out of falling distance of power lines since every electrical and telephone wire should be considered dangerous. The only safe distance from power lines is at least twice the height of tower, mast and antenna combined. Tower should be installed and dismantled by experienced and trained personnel. All antenna installations must be grounded per local or national codes. BASE: See Drawing No. A880445 ...
|
| | Mounts Commercial Residential TRT36-Snap-out design TRT60-4 base spread to accommodate 24 or 16 rafter spacing TRT122-Bolt on braces, ladder face on one side, bolt on foot for hinge-type installation SPECIFICATIONS Part Number Wt. Ht. Packaged TRT30 6# 26 Bulk TRT36 7# 3 Bulk TRT60 10# 5 Bulk TRT122 29# 10 Cardboard Box TRT Bag (optional) 1/2# Bag contains: 6 lag screws foot sealers Do not install towers or masts near power lines. All towers or masts should be installed out of falling distance of power lines since every electrical and telephone wire should be considered dangerous. ROHN ...
|
| | 443 Base: See appropriate ROHN catalog information. The first 10 section should be leveled, plumbed and temporarily guyed or braced while pouring the concrete. Do not pull tower after installation. Check tower to assure it is plumb and level after pouring concrete. Do not pull tower up into the concrete to level it and do not drive it hard into ground as this plugs leg holes and prevents moisture drainage. Crown the top of the concrete slightly to prevent water accumulation. Do not use drive rods as a base for tower when set in concrete. sgfdskglfds;fgk;fdsg;ldsg ;fdsg Height of Tower and Bracket ...
|
| | GENERAL INFORMATION AND PRECAUTIONS IF YOU NEED HELP FROM RADIAN Field technicians, warning labels, catalogs, guy charts, etc. are available from Radian. IF YOU ARE SELLING ROHN PRODUCTS Due to government regulations, be sure you and your customers are informed as to proper use when purchasing any antenna supporting structure. MIXING OF PRODUCTS The mixing of so-called interchangeable copies of ROHN products with ROHN products is dangerous and voids all engineering or warranty data supplied by Radian. Materials used by the so-called copies are not the same quality and have not been tested or engineered ...
|