Page 140 of Wood Construction Connectors 2006 Catalog by Simpson Strong-Tie
The TSF is a fast and accurate method for spacing trusses that eliminates
layout marking of top plates and can be left in place under the sheathing.
Accuracy is improved, spacing errors are minimized, and it is easy to use.
MATERIAL: 24 gauge. FINISH: Galvanized.
INSTALLATION: See Installation Sequence below.
TSF Truss Spacers do not provide bracing of any kind and
are not structural members. The TSF is for spacing only.
Refer to instructions from architect, engineer, truss manufacturer
or other for bracing and installation information.
CODES: See page 12 for Code Listing Key Chart.
Model
No.
Dimensions
W
O.C.
Spacing
Total
Length
TSF2-16
1
16
8'
TSF2-24
1
24
10'
Code
Ref.
180
STEP 1
Nail starting notch to first member.
STEP 2
As each successive member is
positioned, unfold TSF to next
notch. The notch teeth grip
member and align it for nailing.
STEP 3
If spacer does not align with end
truss, break spacer off at notch.
Then, hammer spacer flat, fold
it under and nail.
TSF
141
Plated Truss Connectors
TSF Truss Spacer
TBD20 Diagonal Truss Bracer
The TBD20 is a temporary truss bracing strap system used in conjunction
with TSB2 to meet or exceed TPI/WTCA BCSI 1-03 recommendations. When
installed on the top and bottom, TBD20 captures the top and bottom truss
chords lateral construction and wind forces delivered by TSB2 and transfers
it diagonally in tension to the edge of the braced truss system.
FEATURES: Higher capacity for wind applications than traditional
wood lateral systems.
Strap clip system introduces innovative single and double shear
combination to achieve higher capacity.
Has a low profile that can be sheathed over, eliminating the need
to remove bracing prior to sheathing.
TBD20 and TSB2, sheathed over, can be a supplemental permanent
bracing system to the roof sheathing.
MATERIAL: 20 gauge. FINISH: Galvanized
INSTALLATION: Use all specified fasteners; see General Notes.
TBD20 straps span diagonally at approximately 45 between
parallel TSB-2 bracers.
Strap shall not be slack, but tight and ready to engage in tension.
TBD20 tension straps shall be installed for each direction, thus creating
an X-bracing system.
To resist construction forces, refer to TPI/WTCA BCSI-03 for location
and frequency of X-braced sections.
To resist wind forces, the designer of record shall evaluate the structure
to determine the location and frequency of X-braced sections.
For wind applications, solid blocking between X-braced trusses with LTP5
or RBC to top plate and H2.5 or H2.5A at each strap clip end from truss
to top plate are recommended to resist lateral and uplift forces respectively.
Design of lateral and vertical load path to deliver forces to ground is
by designer of record.
CODES: See page 12 for Code Listing Key Chart.
Each carton
contains 12 straps
(each 13 l long)
and 24 clips.
Typical TBD20
Top Chord Installation
1. Allowable loads have been increased for construction and wind
loading with no further increase allowed.
2. 4-10dx1 nails at exterior clip section and 2-10dx1 at interior clip section.
3. Allowable tension loads are based on a 2.5 reduction factor.
4. NAILS: 10dx1 0.148" dia. x 1 long.
See page 16-17 for other nail sizes and information.
650
170
TBD20
6-10dx1
1-10dx1
755
Allow. Tension Loads 1,3
DFL/SP
SPF/HF
Model
No.
Fasteners
Strap End
2
Bracket
At Intermediate
Trusses
Code
Ref.
TBD20
US Patent 6,877,291
[close]