Page 26 of Wood Construction Connectors 2006 Catalog by Simpson Strong-Tie
27
Concrete Connectors
FA/FAP/HFA/FJA/FSA Foundation Anchors
This series is for retrofit or new construction. These products
may be used together as a system or in individual applications,
designed and tested for earthquake and high wind conditions.
FA and HFA Foundation Anchors eliminate vertical drilling by
nailing into the top of the mudsill. They facilitate installation when
vertical space is limited, and resist forces between the foundation
and mudsill. The FAP Plate connects the mudsill to the foundation.
Designed to provide lateral load resistance.
FJA Foundation Joist Anchor nails or bolts directly into floor joist,
and provides a direct connection between the foundation and joist.
It provides uplift and lateral resistance. FSA Foundation Stud Anchor
nails or bolts to floor joist, or nails to stud. Plywood shearwall may
require notching with stud-to-foundation installation.
MATERIAL: FAP 7 gauge; all others 12 gauge
FINISH: Galvanized. May be ordered HDG, check with our factory.
See Corrosion Information, page 6-7.
INSTALLATION:
Use all specified fasteners; see General Notes.
Select and install concrete anchor bolts in accordance
with the manufacturers recommendations.
Use the RFB#4x6 with Epoxy-Tie for the anchorage system.
CODES: See page 12 for Code Listing Key Chart.
Model
No.
Max Spacing
to Replace
Anchor Bolts
Fasteners
Allowable Loads DF/SP
Anchor
Bolt
Stud/Joist/Plate
(133)
(160)
"
Qty
Dia
Uplift
F1
F2
Uplift
F1
F2
FAP
5 '
4'
2
3-SDS x 2 shim thickness
950
365
950
365
FA6
2
1 '
2
7-10dx1
400
515
400
515
FA8
7-10dx1
400
515
400
515
HFA6
6'
6'
3
11-10dx1
1350
365
1400
365
HFA8
11-10dx1
1350
365
1400
365
FJA
2
8-10dx1
1000
185
60
1205
185
60
2- MB
575
185
60
690
185
60
97
8, 97, 121
8, 36, 91, 121
9, 121
8, 36, 91,
121
FSA
2
8-10dx1
1000
1205
2- MB
575
690
Code
Ref.
1. Allowable loads have been increased 33% and 60% for earthquake or wind loading
with no further increase allowed; reduce where other load durations govern.
2. For redwood mudsills, reduce F1 on HFA to 1215 lbs, and 840 lbs on FAP.
3. Spacing to be specified by the Designer.
4. FAP shall use a minimum SDS wood screw length of 2 plus the shim thickness.
5. The shim must be fastened to the mudsill by means other than the FAP wood screw.
6. See page 20 for SDS wood screw information.
7. FAP may be installed with HDG lag bolts. Follow code requirements for predrilling.
8. NAILS: 10dx1 0.148" dia. x 1 long.
See page 16-17 for other nail sizes and information.
Typical FSA Installation
Foundation to Joist
Typical FA Installation
Foundation to Mudsill
Slotted for easy bending
for trapezoid foundations
Typical FAP
Installation
Foundation
to Mudsill
Typical FSA Installation
Foundation to Stud
Add a shim between plate and sill when
space is between and 1 ". When
space exceeds 1 use the FA or HFA.
The shim must be fastened to the mudsill by
means other than the FAP SDS wood screw.
FJA/FSA
Typical FJA Installation
Foundation to Joist
FA8
(FA6 similar)
HFA6
(HFA8 similar)
FAP
(screws not included)
Available with additional corrosion protection. Check with factory.
For Corrosion Information, see page 6-7.
[close]