Page 44 of Wood Construction Connectors 2006 Catalog by Simpson Strong-Tie
SPALL REDUCTION SYSTEM
FOR PAHD AND HPAHD
Keyhole Feature
U.S. Patent
6,658,806
SM1
45
Anchors
PA/PAHD/HPAHD Strap Tie Holdowns
Typical PAHD42
before the Concrete Pour
INSTALLATION 1
Typical HPAHD Single
Pour Edge Installation
INSTALLATION 2
Typical HPAHD Single Pour
Corner and Endwall Installation
SINGLE POUR INSTALLATIONS
TWO POUR INSTALLATIONS
STRAP
STYLE
HOLDOWN
le
4" SLAB
MAX.
HORIZONTAL
PROJECTION
OF EMBEDDED
PORTION
OF STRAP
HOLDOWN
LOCATE ONE
#4 REBAR WITHIN
HATCHED AREA
(MAY BE
FOUNDATION REBAR)
DOES NOT NEED TO
BE TIED TO REBAR
*
CONCRETE
FOUNDATION
BY OTHERS
Two Pour Rebar Installation
*Maintain minimum rebar cover, per
ACI-318 concrete code requirements.
Spalling may occur if the
anchor is bent horizontally
90 before installation, and
then bent up vertically to
attach to the stud.
Load reduction may apply.
Typical PA51 Installation
(PA68 similar)
INSTALLATION 4
Typical HPAHD22-2P Two Pour Edge
Installation. Unless noted, install other
models with bend embedment line at
cold joint between slab and foundation.
INSTALLATION 5
Typical HPAHD
Two Pour Corner
Installation
FEATURES
Secures holdown to wood
form-board.
Allows for proper side-cover.
Keeps strap vertical.
Prevents tilting or twisting of
strap during the concrete pour.
Uses one 16d duplex nail.
BENEFITS
Greatly reduces spalling and
costly retrofits.
Helps prevent strap movement parallel
and perpendicular to plate.
Decreases possibility of misinstallation
of strap to wood member.
Simple to use: Common jobsite nail.
- No additional expense.
When using keyhole feature, care should be taken when removing
form boards. If concrete is not set, the duplex nail will move the
strap placement.
SPALLING!
Spalling may occur if the
anchor is bent horizontally
90 before installation,
and then bent up vertically
to attach to the stud. Load
reduction may apply.
le
LOCATE ONE
#4 REBAR WITHIN
HATCHED AREA
(MAY BE
FOUNDATION
REBAR)
*
CONCRETE
FOUNDATION
BY OTHERS
STRAP
STYLE
HOLDOWN
HORIZONTAL
PROJECTION
OF EMBEDDDED
PORTION
OF STRAP
HOLDOWN
Single Pour Rebar Installation
*Maintain minimum rebar cover,
per ACI-318 concrete code
requirements.
INSTALLATION 3
Typical HPAHD Single Pour
Rim Joist Installation
(Reduce allowable load based on
quantity of effective nails used.)
[close]