Page 47 of 195 ![]() |
![]() View extracted text
Page 47 of Wood Construction Connectors 2006 Catalog by Simpson Strong-Tie48 Caps Bases PB/PBS Regular and Standoff Post Bases IS Insulation Supports Typical PB Installation Model No. Dimensions Allowable Loads (DF/SP) W L 12-16d Nails (133 160) 2- MB Uplift F1 F2 Uplift (133 160) PB44 3 3 1365 765 1325 PB44R 4 3 1365 765 1325 PB46 5 3 1365 765 1325 7, 90, 121 7, 62, 90, 121 PB66 5 5 1640 765 1325 1640 PB66R 6 5 1640 765 1325 1640 Code Ref. The PBS features a 1" standoff height. It reduces the potential for decay at post and column ends. MATERIAL: PB 12 gauge; PBS see table. FINISH: Galvanized. Some products available in Z-MAX or HDG; see Corrosion-Resistance, page 6-7. INSTALLATION: Use all specified fasteners. See General Notes. Post bases do not provide adequate resistance to prevent members from rotating about the base and therefore are not recommended for non top-supported installations (such as fences or unbraced carports). PB: Holes are provided for installation with either 16d commons or bolts for PB66 and PB66R; all other models use 16d commons only. A 2" minimum sidecover is required to obtain the full load. PBS: Embed into wet concrete up to the bottom of the 1" standoff base plate. A 2" minimum side cover is required to obtain the full load. Holes in the bottom of the straps allow for free concrete flow. CODES: See page 12 for Code Listing Key Chart. Typical PBS44A Installation Model No. Nominal Post Size Material Dimensions Fasteners Allowable Loads (DF/SP) Base (Ga) Strap (Ga) W L H HB Anch. Dia Post Uplift (133) Uplift (160) F1 (133 160) F2 (133 160) Down (100) Nails Nails Bolts Nails Bolts Nails Bolts Nails Bolts Qty Dia 5, 41, 85, 121 PBS44A 4x4 12 14 3 3 3 14-16d 2 2400 2400 2400 2400 1165 230 885 885 6665 6 PBS46 4x6 12 14 3 5 3 14-16d 2 2400 2400 2400 2400 1165 360 885 885 9335 6 Machine Bolts Code Ref. PBS66 6x6 12 12 5 5 3 14-16d 2 2630 3560 3160 4000 1865 570 1700 1700 9335 6 1. Allowable loads have been increased 33% and 60% for earthquake or wind loading; no further increase allowed; reduce where other loads govern. 2. PBS Downloads may not be increased for short-term loading. 3. PBS Designer to design concrete for shear capacity. 4. PBS For higher downloads, solidly pack grout under 1" standoff plate before installing into concrete. Base download on column or concrete, according to the code. 5.Downloads shall be reduced where limited by buckling capacity of the post. 6. When using structural composite lumber posts, bolts must be applied to the wide face of the post. 7. NAILS: 16d 0.162" dia. x 3 long. See page 16-17 for other nail sizes and information. PB Available with additional corrosion protection. Check with factory. Typical IS Installation Mitered edges ensure a tight fit when installed between joists. INSTALLATION: Install between joists. IS16 for 16" o.c. spacing; IS24 for 24" o.c. spacing. Follow insulation manufacturers installation instructions. Wear safety glasses, gloves and other appropriate safety equipment. Model Gauge Length IS16 15 " IS24 14 ga 14 ga 23[close] |
Page 47 of 195 ![]() |
All Copyrights are and remain property of Simpson Strong-Tie. Who-sells-it.com is not an official partner of Simpson Strong-Tie. |