Page 83 of 195 ![]() |
![]() View extracted text
Page 83 of Wood Construction Connectors 2006 Catalog by Simpson Strong-Tie84 Solid Sawn Connectors HRC Hip Ridge Connectors PF Post Frame Hangers PFD26 (PFD24, PFDS26,PFD26L similar) U.S. Patent 5,104,252 PFD and PFA post frame hangers have double shear nailing to speed installation. Diamond holes allow easy hanger alignment and attachment. MATERIAL: 20 gauge FINISH: Galvanized. Some products available in Z-MAX; see Corrosion-Resistance, page 6-7. INSTALLATION: Use all specified fasteners. See General Notes. Diamond holes on PFD allow optional top flange nailing. Double shear nailing distributes the load through two points on each nail for greater strength. OPTIONS: These hangers cannot be modified. CODES: See page 12 for Code Listing Key Chart. Model No. Dimensions Spruce-Pine-Fir Allowable Loads 1 Fasteners W H B TF Carrying Member Uplift 2 (133) PF24 1 3 1 1 2-10d PF24A 1 3 1 1 2-10d PFD24 1 3 1 1 2 PRONGS PF26 1 5 1 1 2-10d PF26A 1 5 1 1 2-10d PFD26 1 5 1 1 2 PRONGS PFD26L 1 5 1 1 2-10d PFDS26 1 5 1 3 4-10d Carried Member 2-10d 2-10d 2-10d 2-10d 4-10d 4-10d 2-10d 4-10d 190 190 190 380 420 380 380 420 Uplift 2 (160) 230 230 230 455 505 455 455 505 Floor (100) 650 650 650 805 765 805 805 765 Snow (115) 660 660 675 850 770 850 850 805 Roof (125) 660 660 690 880 770 880 880 835 Wind (133) 660 660 700 905 770 905 905 855 2, 40, 82, 121 2, 40, 82, 121 4, 37, 121, 140 4, 37, 121, 140 170 4, 37,121,140 Doug-Fir-Larch Southern Pine Allowable Loads 1 Uplift 2 (133) 260 235 235 260 520 470 260 520 Uplift 2 (160) 310 280 280 310 620 560 310 620 Floor (100) 955 840 840 955 970 1015 955 970 Snow (115) 955 865 865 955 1020 1070 955 1020 Roof (125) 955 885 885 955 1050 1105 955 1050 Wind (133) 955 895 895 955 1075 1130 955 1075 Code Ref. 1. To assure the table loads, the carried members nails must be common nails and driven at an angle through the carried member into the carrying member. 2. Uplift loads have been increased 33% and 60% for earthquake or wind loading with no further increase allowed; reduce where other loads govern. 3. NAILS: 10d 0.148" dia. x 3" long. See page 16-17 for other nail sizes and information. PF24 (PF26 similar) U.S. Patents 5,104,252 PF26A (PF24A similar) Available with additional corrosion protection. Check with factory. Model No. Member Size Fasteners Spruce-Pine-Fir Allowable Loads Doug Fir Larch/So. Pine Allowable Loads W Ridge Carrying Member Each Hip Uplift (133) Uplift (160) Floor (100) Snow (115) Uplift (133) Uplift (160) Floor (100) Snow (115) HRC22 1 2x or 1 wide 16-10dx1 2-10dx1 240 290 720 210 250 625 830 HRC42 1 4x 16-16d 2-10dx1 240 290 1050 1050 210 250 905 720 905 HRC44 3 4x 24-16d 6-16d 480 480 1610 1775 Roof (125) 900 1050 1775 410 410 1385 1525 Roof (125) 780 905 1525 Code Ref. 9, 121 1. Allowable loads shown are for each hip. Total load carried by the connector is double this number. 2. Uplift loads include a 33% and 60% increase for earthquake or wind loading; no further increase allowed; reduce where other loads govern. 3. Roof loads are 125% of floor loads unless limited by other criteria. 4. NAILS: 16d 0.162" dia. x 3 long, 10dx1 0.148" dia. x 1 long. See page 16-17 for other nail sizes and information. HRC22 HRC44 (HRC42 similar) U.S. Patent 5,380,116 Typical HRC22 Installation on the end of a ridge MATERIAL: HRC22, HRC42-16 gauge; HRC44-14 gauge FINISH: Galvanized INSTALLATION: Use all specified fasteners. See General Notes. On end of ridge use optional diamond holes on HRC22 and HRC42 to secure the HRC. Bend face flanges on HRC22 back flush with ridge, and complete nailing. HRC22 on face of ridge adjust to correct height and install nails. Double bevel-cut hip members to achieve full bearing capacity. The HRC may be sloped to 45 with no reduction in loads. CODES: See page 12 for Code Listing Key Chart. Optional HRC22 Installation[close] |
Page 83 of 195 ![]() |
All Copyrights are and remain property of Simpson Strong-Tie. Who-sells-it.com is not an official partner of Simpson Strong-Tie. |