2x Plate H 3x Plate S Floor (100) Roof (125) GH46-6 4x6 3 6 4 6 2000 2000 7 ... , 90, 121 170 GH46-8 4x6 3 6 4 8 2000 2000 GH48 ... for use with a 3x plate. 4. NAILS: 16d 0.162" dia. x 3 long. See page 16-17 ... -foundation wall connection. MATERIAL: 12 gauge. FINISH: Painted. May be ordered ... . See General Notes. Insert four 16d commons into girder. H girder height ... other sizes available. CODES: See page 12 for Code Listing Key Chart. GH Girder ... on test results using Simpsons SDS x3 screws, which are supplied with the UFP10. ... Alternate lag screws will not achieve published loads. ... anchorage solutions. CODES: See page 12 for Code Listing Key Chart. Model No. ... Plate Qty Dia UFP10-SDS3 6' 2 5-SDS x3 1340 30, 96 1. Allowable loads have ...
. MATERIAL: FAP 7 gauge; all others 12 gauge FINISH: Galvanized. May be ... the anchorage system. CODES: See page 12 for Code Listing Key Chart. Model No. ... /SP Anchor Bolt Stud/Joist/Plate (133) (160) " Qty Dia Uplift F1 F2 Uplift F1 F2 ... FAP 5 ' 4' 2 3-SDS x 2 shim thickness 950 365 950 365 ... 1400 365 FJA 2 8-10dx1 1000 185 60 1205 185 60 2- MB 575 185 60 690 185 60 97 8 ... , 97, 121 8, 36, 91, 121 9, 121 8, 36, 91, 121 FSA 2 8-10dx1 ... 1000 1205 2- MB 575 690 Code Ref. 1. ... redwood mudsills, reduce F1 on HFA to 1215 lbs, and 840 lbs on FAP. 3. Spacing to ... . 4. FAP shall use a minimum SDS wood screw length of 2 plus the shim thickness. 5 ... by means other than the FAP wood screw. 6. See page 20 for SDS wood screw ... . 7. FAP may be installed with HDG lag bolts. Follow code requirements for ...