26 Concrete Connectors UFP Universal Foundation Plate Model No ... GH48-8 4x8 3 6 6 8 2000 2000 GH66-6 6x6 5 8 4 6 4000 4000 GH66-8 6x6 5 8 4 8 ... for short-term loading. 2. A mudsill on top of the GH is required to achieve the ... . Typical GH Installation GH A girder-to-foundation wall connection. MATERIAL: 12 gauge. ... installation time in half. Designed to connect when the mudsill is offset from ... the foundation up to 2 or extended beyond the foundation up ... to ". The UFP may be used in place of the ... FA, HFA and FAP connectors. MATERIAL: 14 gauge. FINISH: Galvanized ... not achieve published loads. Refer to T-ANCHORSPEC for post-installed ... Key Chart. Model No. Max Spacing to replace Anchor Bolt or dia. Fasteners ... Allowable Load Parallel to Plate (133) Code Ref. Anchor Bolt Plate ...
portion of the holdown when loaded to the highest allowable load listed in ... table. This movement is strictly due to the holdown deformation under a static ... lumber columns, bolts must be applied to the wide face of the column. 11. The ... on a steel test jig divided by 2.5. 13. Post design shall be by Designer. 1. ... 4x8 (in a 3 wide shearwall) or a 6x6 nominal post to ensure the tension ... capacity. 3. Use a minimum 4x6 nominal post for the HD14A. Minimum post size is ... required to ensure the tension load carrying ... distance from the end of the stud to the center of the first stud bolt hole ... See notes below. A B and F do not apply to the PHD and HDQ. A. Bolt slip can occur ... under load caused by stresses due to earthquake or high wind. G. Lateral ... displacement at the top of the wall rotates the stud around its ...