bolts with the provided hardware. The top of the wall attaches with pre-installed ... SDS screws to double top plates or can fasten to various header ... the anchor bolts followed by a simple top and bottom plate attachment. Use 1 ... ) H (in) T (in) Number of Fasteners in Top of Wall Number of Mudsill Anchors 3 ... , 137, 150 STANDARD STRONG-WALL 1. For plywood shear panel, add P to model name (e.g. ... SW24x8P), and multiply the table loads by 0.88. 2. For two-pour ... shim height between Strong-Wall and top plates or header is ". Shims of greater ... . 5. See allowable vertical load table on page 64 for Strong-Wall maximum ...
requirements of the structure. 1. For plywood shear panel, add P to model name (e.g. ... SW24x8P), and multiply the table loads by 0.88. 2. For two-pour ... shim height between Strong-Wall and top plates or header is ". Shims of ... . 6. See allowable vertical load table below for Strong-Wall maximum ... ) H (in) T (in) Number of Fasteners in Top of Wall Number of Fasteners in Bottom ... ) H (in) T (in) Number of Fasteners in Top of Wall Number of Fasteners in Bottom ... . C3 Max. compressive force applied to top plates between studs. C4 Max. ... and shear capacity of the combined top plates. Loads that result in net uplift ... limited by the value T 1 shown in the table ...