435 lbs (uplift), 700 lbs (parallel to plate) and 240 lbs. (perpendicular to plate ... stud has load of 960 lbs (parallel to plate) and 360 lbs (perpendicular to plate). ... LMA4 and LMA6 Installation Model No. Sill Size Fasteners Allowable Loads 1 (133) ... ) Sides Total Top Uplift 2 Parallel to Plate (F1) Perp to Plate (F2) Parallel to ... Plate (F1) Perp to Plate (F2) Uplift 2 MAS 2x4,6 3x4,6 2-10dx1 ... an economical replacement for diameter sill plate bolts. The MASB is designed for ... lose. Fast for the framer eliminates plate drilling and mislocated anchor bolts. ... a hole through the mudsill and install straps through the hole. Wrap MAB straps ... Over Max. Plywood or OSB Model No. Sill Size Fasteners Sides Total Allowable ...
concrete cures, remove nails and bend straps up 90 . STEP 2: Place mudsill on ... Spacing MAB Misinstallation (MAB straps must be separated before the concrete ... Typical MAS Installation 3 " 2x4 PLATE 1. Place anchors not more than 1' from ... the end of each sill per code. 2. Spacing is based on ... parallel to plate load direction only. 3. All grout and ...